The scope, in full
Every room, material, finish and fixture they are approving, printed as a document they can sign. Quotation Without Price is a standard report, not a file someone rebuilt with the price column deleted.
You price from a spreadsheet of materials, revise it four times, buy from twenty vendors and bill in stages. Optigestix keeps all of it on one record, so the quote the client approved is the project your site team builds, and the margin is a number you can see in week three.
This is the sequence that replaces it.
Every material, finish and fixture you price from, held once and searchable. Not a spreadsheet somebody duplicated in March.
Line items come off the catalogue with margin control on each. Revisions land on the same record instead of becoming v2, v3 and v4 in a folder.
What the client said yes to is what the project carries. Your site team cannot build from a superseded revision because there isn't one to open.
Billing reads the approved scope. The gap where a job is built on v2 and invoiced on v4 simply has nowhere to open up.
One quotation, two prints. Most firms maintain these as two files by hand, and get caught when they diverge.
Every room, material, finish and fixture they are approving, printed as a document they can sign. Quotation Without Price is a standard report, not a file someone rebuilt with the price column deleted.
Line rates, margin per item and the total the project will be measured against. Change the quotation once and both prints change, because there is only ever one document underneath.
A 360° walkthrough attached to the project record and shared with the proposal, sitting next to the specification for the space. No third-party app in the loop and nothing for the client to install.
For a turnkey job, this is the difference between a client imagining the space and a client deciding on it.
See the Virtual Tour module
The reconciliation an interiors firm currently does in a diary, done by the record instead.
01Purchase orders raised from the catalogue, against the project that needs the material
02Vendor bills booked to that project, not to a general pool sorted out at handover
03Payouts routed through an approval before money leaves
04Demand for one product totalled across every live quotation, before you negotiate
Revenue, cost and margin per project, read off live records rather than assembled at handover. A job drifting from 22% to 9% shows up while there is still a decision to make about it, and it tells you whether to take the next one at that rate.
Invoices raised against the project and aged from the day they go out, so receivables sort by how long they have been sitting. The GST summary and the TDS report come out of the same records that raised them.
Thirty minutes. We build it in Optigestix while you watch, turn it into a project, raise the invoice and show you the margin.